unclesyd
Materials
- Aug 21, 2002
- 9,819
I had to move the power pole for my shop about 10' as my old ground 3/8" EC Copper 16 ft long is going to be covered up. I installed a new ground made from EC Copper 3/4" rod with 1/4" bore x 20' long and hooked every thing up. It was inspected yesterday and when I went out to get the number off the inspection ticket for the power company the ground was noted as not up to code and had not passed inspection no other explanation.
It is a only a 100 Amp Main and the local codes say 3/8" copper or 1/2" copper plated steel ground rod.
What could be the reason for the inspectors call?
It is a only a 100 Amp Main and the local codes say 3/8" copper or 1/2" copper plated steel ground rod.
What could be the reason for the inspectors call?