Jmeng1026
Structural
- Jun 11, 2018
- 52
A client would like to remove a 6' wide portion of his existing 8" concrete foundation and install a doorway and make it walkout. The problem would be he would be removing 4' of existing grade in that area and my area requires the footing to be 4' below grade. Any suggestions on how to provide frost protection under the foundation wall where the existing grade will be removed? His footing would be right at grade level once he removes the material.