nightfox1925
Electrical
- Apr 3, 2006
- 567
Is the connection for conducting an insulation resistance test for 3 phase bus bars (in an MCC) similar to 3core cable test applications that is:
Example for Phase A to ground:
1. Connect the Line (+) lead of the megger to Phase A Bus.
2. Short both phases B and C and connect to the Earth lead
of the megger and ground bus.
If a Guard terminal is available, then 2.) becomes: short phases B and C and connect them to the Guard temrinal of the megger. The Earth terminal is connected to the ground Bus.
Example for Phase A and Phase B
1. Connect the Line (+) lead of the megger to Phase A
2. Connect the Earth terminal to Phase B
If guard terminal is available, then ????
Are the procedures stated correct...I would greatly appreciate if anyone provide me a link or a simplified diagram that would show me some connections.
Thanks
Example for Phase A to ground:
1. Connect the Line (+) lead of the megger to Phase A Bus.
2. Short both phases B and C and connect to the Earth lead
of the megger and ground bus.
If a Guard terminal is available, then 2.) becomes: short phases B and C and connect them to the Guard temrinal of the megger. The Earth terminal is connected to the ground Bus.
Example for Phase A and Phase B
1. Connect the Line (+) lead of the megger to Phase A
2. Connect the Earth terminal to Phase B
If guard terminal is available, then ????
Are the procedures stated correct...I would greatly appreciate if anyone provide me a link or a simplified diagram that would show me some connections.
Thanks