RDMESH
Structural
- Dec 9, 2014
- 18
Intermediate Moment connection requirements.
- I have project where the intermediate moment frame is not braced at the bottom flange as per the AISC requirement near the support. The top of beam is braced by the concrete planks. My question is if the bottom flange of beam is not braced is there other design requirements i could verify to see if the connection design is still acceptable. Any suggestions would be appreciated.
Thanks,
- I have project where the intermediate moment frame is not braced at the bottom flange as per the AISC requirement near the support. The top of beam is braced by the concrete planks. My question is if the bottom flange of beam is not braced is there other design requirements i could verify to see if the connection design is still acceptable. Any suggestions would be appreciated.
Thanks,