POLYENGMOR
Civil/Environmental
- Sep 3, 2021
- 22
Hello,
First of all, excuse me if I don't use the right vocabulary.
I am currently working on updating the calculation of high point vents/low point drains of a 1000mm pipe (drinking water), the pipe has already been commissioned.
In the calculation, there is an intermediate point vent between a high point vent and a low point drain. In the execution, the intermediate point vent was placed 50 meters from where it should be (high point vent side). As a result, we always need an additional intermediate point vent.
Is it possible to size the intermediate point vent already built (put a bigger air valve for example) so as not to have to add an additional intermediate point vent?
First of all, excuse me if I don't use the right vocabulary.
I am currently working on updating the calculation of high point vents/low point drains of a 1000mm pipe (drinking water), the pipe has already been commissioned.
In the calculation, there is an intermediate point vent between a high point vent and a low point drain. In the execution, the intermediate point vent was placed 50 meters from where it should be (high point vent side). As a result, we always need an additional intermediate point vent.
Is it possible to size the intermediate point vent already built (put a bigger air valve for example) so as not to have to add an additional intermediate point vent?