steve58
Mechanical
- Jun 19, 2001
- 16
I have been reviewing a proposal from a company to install on-site power generation (natural gas fired engine generators) to handle a part of their building load. The remaining load would still be supplied from the local utility power grid. Has anyone dealt with this situation? I am particularly interested in how you segregate (or if you can) the grid supplied power from the on-site generator to avoid an inadvertant out-of-phase sync of the two systems. Is this something someone has done in a commercial office building?