Tofflemire
Marine/Ocean
- Oct 3, 2002
- 312
Hi All
I have question which has been bugging me for awhile. In my drawing templates/format is a field set to &PROI_REVISION. This updates when you change the revision in Intralink, is there a way to update this field in drawing mode without having to save the drawing, close and erase memory and reopen?
Thanks for you help
Tofflemire
I have question which has been bugging me for awhile. In my drawing templates/format is a field set to &PROI_REVISION. This updates when you change the revision in Intralink, is there a way to update this field in drawing mode without having to save the drawing, close and erase memory and reopen?
Thanks for you help
Tofflemire