Hi,
Exiting BNR WWTP has design capacity 14,000m3/d ADF. At plant we do see total daily flow 12000m3/day. There is no future potential to increase the flow which lead to increase the loading.
Currently, the town collect around 2000 ton SSO (food waste). I am looking for the idea for how to introduce process SSO to BNR plant.
Currently, all SSO go to landfill. we would like to work out the options to do diversion of SSO. We have approached DE packaging equipment which has potential to separate organic material from SSO by removing cans, plastic, fork....
please share your idea or experience on topic.
Many thanks in advance for you time.
Regards,
Exiting BNR WWTP has design capacity 14,000m3/d ADF. At plant we do see total daily flow 12000m3/day. There is no future potential to increase the flow which lead to increase the loading.
Currently, the town collect around 2000 ton SSO (food waste). I am looking for the idea for how to introduce process SSO to BNR plant.
Currently, all SSO go to landfill. we would like to work out the options to do diversion of SSO. We have approached DE packaging equipment which has potential to separate organic material from SSO by removing cans, plastic, fork....
please share your idea or experience on topic.
Many thanks in advance for you time.
Regards,