Carlloss
Mechanical
- Feb 20, 2012
- 21
Hi,
I am new to IP rating and currently I try to establish if there is any standard (or other legal document) that would define testing for production parts with assigned IP rating (in order to make sure that the rating is maintained). I do not think that every enclosure is subject to same IP testing as the units used for obtaining certification, yet there must be a way/base for manufacturer to declare that rating is maintained. So far, I found that EN 60529 has a statement: "This standard deals only with enclosures that are in all other respects suitable for their intended use as specified in the relevant product standard and which from the point of view of materials and workmanship ensure that the claimed degree of protection are maintained under the normal conditions of use" Base on this can I not test production enclosures at all as long as I maintain workmanship (bit vague to me) or shall I establish internal quality control process e.g 1 every 100 to be tested? Any thoughts or guidance, maybe there is someone who deals with IP rated parts already. Thank you.
Karol
I am new to IP rating and currently I try to establish if there is any standard (or other legal document) that would define testing for production parts with assigned IP rating (in order to make sure that the rating is maintained). I do not think that every enclosure is subject to same IP testing as the units used for obtaining certification, yet there must be a way/base for manufacturer to declare that rating is maintained. So far, I found that EN 60529 has a statement: "This standard deals only with enclosures that are in all other respects suitable for their intended use as specified in the relevant product standard and which from the point of view of materials and workmanship ensure that the claimed degree of protection are maintained under the normal conditions of use" Base on this can I not test production enclosures at all as long as I maintain workmanship (bit vague to me) or shall I establish internal quality control process e.g 1 every 100 to be tested? Any thoughts or guidance, maybe there is someone who deals with IP rated parts already. Thank you.
Karol