dzupfrg
Industrial
- Nov 22, 2011
- 87
How it woks this metod?
I have 2 program group. In Program 2 group I would like to select blank geometry as IPW from group Program 1. See atach. After selecting Blank geometry as "IPW - In process workpiece" and "Update Local IPW from Souce", system show alerts - see atach.
Thanks for help.
NX 8.0.0.25 MP1
I have 2 program group. In Program 2 group I would like to select blank geometry as IPW from group Program 1. See atach. After selecting Blank geometry as "IPW - In process workpiece" and "Update Local IPW from Souce", system show alerts - see atach.
Thanks for help.
NX 8.0.0.25 MP1