EngMike1144
Structural
- Apr 24, 2013
- 1
I'm reviewing the prescriptive masonry requirements of the IRC for the first time and I'm having trouble understanding the language in section R703.7.2.2. It seems to imply that I need to fasten the first rafter with (3) 5/8" x 5" lag screw at every stud. That seems like a lot of screws into the edge of a single stud.
I'd like to assume they meant that each rafter needs a minimum of three lag screws, but only one at each stud. The offending sentence in the code is "...minimum of three 5/8" diameter by 5" lag screws to every wood stud spacing." Any idea what the code writers really meant?
-Mike
I'd like to assume they meant that each rafter needs a minimum of three lag screws, but only one at each stud. The offending sentence in the code is "...minimum of three 5/8" diameter by 5" lag screws to every wood stud spacing." Any idea what the code writers really meant?
-Mike