Is it necessary to let steel sea fasting brackets (S355) fastening containers to a ship’s deck cool down before MPI?.
Would DNV insist on it, it is a DNV registered vessel?
Thanks
Would DNV insist on it, it is a DNV registered vessel?
Thanks