C. Hirata
Structural
- Nov 11, 2021
- 4
Hello, first time here, we have this project and a supervisor told our people that a beam, HSS 14X6X1/2, should be continuous, without any welded tie, this would result in large material waste, and as far as I know, there is no code that avoid this welded tie, but I'm dubious, is there any code or specification about his issue? (Fyi. I read the client drawings and it doesn't specify against this condition)
best regards
best regards