delagina
Structural
- Sep 18, 2010
- 1,008
I'm checking concrete mix submitted by contractor. I don't really do this match. only thing not matching our notes is estimated density = 140pcf, not 150 pcf per our notes. any problem with this? f'c is met.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
EngineeringEric said:The plant had record of the mix used and video of components being added
Archie264 said:some other type of in-place testing which name I can't remember at the moment. It involved shooting powder actuated studs into the concrete and measuring how far they stuck out