abc123ali
Mechanical
- Nov 6, 2023
- 81
Respected ABAQUS Users, I have running the FEM model as attached cae file in which the job is terminated just after 0.7s while the time period is set to 1s and aslo changed to 7s in both cases the job terminates at 0.7s and not running completely. What should be done to solve the problem?
Thanks for cooperation
Thanks for cooperation