Vitalis 1977
Mechanical
- Jul 26, 2019
- 6
Dear members,
I would really appreciate your replies on the following issue.
In a natural gas turbine driven power plant design, gas buffering is required. This is achieved through pipe type holders.
Client did not clearly specified applicable design code for piping (see contract specification clause below)
Quote
“all the gas pipes shall be designed, constructed and tested in accordance with BS or ANSI B31.1 or ANSI B31.8 “Gas Transmission and Distribution Piping System"
End of quote
ASME B31.1 does not mention the utiliazation of pipe type holders for gas storage but ASME B31.8, does (not for sour service).
Should I proceed with ASME B31.8 or its scope is not applicable due to the code requirement below?
Quote
"......this code (i.e. ASME B31.8) does not apply to piping beyond the outlet of Customer’s meter set assembly... ”
End of quote
Also as per ASME B31.8, Appendix Q – Scope diagram , Figure 3, code states not to use ASME B31.8 after metering station. Is this our case?
I would really appeciate your replies on this code interpertation issue in order to proceed with my wall thickness calculations accordingly.
Thank you advance...
I would really appreciate your replies on the following issue.
In a natural gas turbine driven power plant design, gas buffering is required. This is achieved through pipe type holders.
Client did not clearly specified applicable design code for piping (see contract specification clause below)
Quote
“all the gas pipes shall be designed, constructed and tested in accordance with BS or ANSI B31.1 or ANSI B31.8 “Gas Transmission and Distribution Piping System"
End of quote
ASME B31.1 does not mention the utiliazation of pipe type holders for gas storage but ASME B31.8, does (not for sour service).
Should I proceed with ASME B31.8 or its scope is not applicable due to the code requirement below?
Quote
"......this code (i.e. ASME B31.8) does not apply to piping beyond the outlet of Customer’s meter set assembly... ”
End of quote
Also as per ASME B31.8, Appendix Q – Scope diagram , Figure 3, code states not to use ASME B31.8 after metering station. Is this our case?
I would really appeciate your replies on this code interpertation issue in order to proceed with my wall thickness calculations accordingly.
Thank you advance...