Hi All,

I am making the assumption that if a design change's fault tree has failure rates in it's faults, that failure rate would need to be verified through testing. But would this also depend upon the faults design assurance level though? Thank you.
 
Replies continue below

Recommended for you

?? Hardly anything gets tested. It's mostly by analysis.

TTFN
I can do absolutely anything. I'm an expert!