londonkid
Structural
- Jul 24, 2010
- 14
HI, I have a situation where there is an existing piled foundation. A large baseplate (part of frame of a rectangular steel tank) will sit on a new found adjacent. However due to constraints part of the base will have to sit over the existing found. Therefore the 'baseplate' will sit over the joint between the two.
HOw would you resolve this? My thoughts are, connent in with dowel bars (lots of) to try and create a situation akin to a normal construction joint.
Or Cut out the part of the existing that will carry the load and re cast as one base with the new(will require re analysis of the existing as it still in original use).
Any other ideas? We cannot move the new proposed from its position that is proposed due to other constraints.
HOw would you resolve this? My thoughts are, connent in with dowel bars (lots of) to try and create a situation akin to a normal construction joint.
Or Cut out the part of the existing that will carry the load and re cast as one base with the new(will require re analysis of the existing as it still in original use).
Any other ideas? We cannot move the new proposed from its position that is proposed due to other constraints.