terramatters
Geotechnical
- Jan 30, 2012
- 4
I have a situation where there is a 45-ft-dia. Manitowoc ringer crane being constructed on steel and timber matting over an approx 2-ft-thick soil fill pad over existing on-site roadways designed for H-20 loading at an industrial site. Crane load will be uniform ground pressure of 4,000 psf. An existing 12 ft by 13 ft of unknown height electrical vault underlies the road surface by 2 or 3 feet. No info available on top slab, base and wall thicknesses and reinforcing. Crane will be in place 2 to 3 months.
Any thoughts on likelihood of damage to vault - low, moderate, high? One way to look at the 4ksf load is as 35 ft of fill at 120 pcf; not exactly the same but similar, like a vault buried 35 feet deep. Anybody come across an example of this or observed what actually happended?
Any thoughts on likelihood of damage to vault - low, moderate, high? One way to look at the 4ksf load is as 35 ft of fill at 120 pcf; not exactly the same but similar, like a vault buried 35 feet deep. Anybody come across an example of this or observed what actually happended?