colonelbogart
Electrical
- Jul 29, 2005
- 20
we have 2-MVA power transformer 4160/480V. 7-325mm2 cables per phase were connected on its secondary bushings. The cables' connections applies some pressures on the bushings causing transformer oil to leak. I am planning to intall braided copper conductor on its secondary bushings to relieved pressures. But until my flexible cables arrived(installed) I am still using my transformer.
Is it OK to still operate the leaking unit?
Is it OK to still operate the leaking unit?