Please let me know if the level guage used for boiler is required to be S stamped ,Or if we buy it from somewhere else does it required required with partial stamping? Considering ASME SEC I PG-58.3
The boiler is deigned on ASME SEC I.
Please let me know if the level guage used for boiler is required to be S stamped ,Or if we buy it from somewhere else does it required required with partial stamping? Considering ASME SEC I PG-58.3