cr1973
Civil/Environmental
- Jul 30, 2003
- 100
I've very little experience in lift station design but was recently asked to review a lift station & forcemain submittal.
The estimated inflow to the 8 ft diameter lift station is 400 gpm. The lift station has 2 pumps, each rated at 400 gpm. Both pumps are off at say elevation 100. Pump #1 on at 101.1, pump #2 on at 101.6.
This doesn't look right to me. First, wet well storage is only ~300 gallons (the bottom of the wet well is sloped and some volume is taken up by the pumps).
Second, pump #1 will run constantly since it's output matches the inflow rate (400 gpm). Pump #2 only runs when inflow is greater than #1 can handle.
Third, pump #1 will wear out much faster than #2 - shouldn't they rotate?
In my experience, a station should cycle 4 or 5 times per hour... pumps shouldn't run non stop.
I think the wet well should hold 10-15 minutes worth of inflow (~5000 gallons).... I also think the pumps should pump out that 5000 gallons within 1 or 2 minutes, so a ~3000 gpm would be needed. Finally I think pumps 1 and 2 should take turns pumping to even out run times.
Am I right, or, am I that out of touch in lift station design?
Thanks
The estimated inflow to the 8 ft diameter lift station is 400 gpm. The lift station has 2 pumps, each rated at 400 gpm. Both pumps are off at say elevation 100. Pump #1 on at 101.1, pump #2 on at 101.6.
This doesn't look right to me. First, wet well storage is only ~300 gallons (the bottom of the wet well is sloped and some volume is taken up by the pumps).
Second, pump #1 will run constantly since it's output matches the inflow rate (400 gpm). Pump #2 only runs when inflow is greater than #1 can handle.
Third, pump #1 will wear out much faster than #2 - shouldn't they rotate?
In my experience, a station should cycle 4 or 5 times per hour... pumps shouldn't run non stop.
I think the wet well should hold 10-15 minutes worth of inflow (~5000 gallons).... I also think the pumps should pump out that 5000 gallons within 1 or 2 minutes, so a ~3000 gpm would be needed. Finally I think pumps 1 and 2 should take turns pumping to even out run times.
Am I right, or, am I that out of touch in lift station design?
Thanks