Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations pierreick on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Lifting a large circular part 1

Status
Not open for further replies.

jerry1423

Mechanical
Aug 19, 2005
3,428
I have a large round cast part, with a finished weight of approx 4000 lbs.
It basically is a conical circular ring with the CG in the center.
The part is oriented in the machine (that it is a component of) the same way as it sits on the floor, so it simply gets lifted and placed into it.

For lifting I added bosses with tapped holes for three equally spaced lift hooks around the outside of the casting.

I was told by the main engineer on this project to add another lift hook so that there are four equally spaced ones instead of three.
With a part as symetrical as this one I think there may be problems, as theoretically all the weight could be balanced on two of the four slings.
I am just a peon here (temp project employee) so trying to explain something like this to him is virtually impossible; he cites that "that's the way we've always done it here".

How can I explain to this guy so that it seems like I know what I am talking about when I explain to him that three lift locations is better than four?
I am by no means an expert at this type of thing, but sometimes it's just hard explaining something that is such common sense to me.
Is there any publication out there that I can cite to support my point ?
If I am wrong at this, let me know that too. There are no issues here with sling or lift hook lift linits.
 
Replies continue below

Recommended for you

At the end of day you are lifting a part onto a machine, once machined will you use the lifting ports to move off the machine? Would using a forklift be a better choice?

Petrotrim Services
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor