reesecc66
Civil/Environmental
- Jan 15, 2013
- 17
I am trying to design two lifting trunnions for a PV and I'm having trouble getting the shell stresses to cooporate. I'm following Procedure 5-4 from Dennis Moss' PV Design Manual 3rd Ed. but the stress values I'm getting seem to be way too high. I'm using a 6" S/XXS A106 pipe, 30kip load at 8" from shell and I'm getting stresses in excess of 300ksi! I've redone the calcs a few times and the numbers aren't getting any smaller. I can increase the pipe size up to 8" if necessary but I just have a feeling that 300ksi is just way too high and increasing to 8" won't suffice. Any help/direction would be appreciated. Thanks in advance.