SA07
Electrical
- Feb 22, 2018
- 365
Hi
We are a power plant. Since construction, lightning rod were installed on the boiler, substation 66 kV, lightning arresters on 66 kV lines and earth cables over 66 kV transmission lines. Over time 2 additional small power plants were constructed. They are not sufficiently protected against lightning.
We want to do a study for lightning protection of the whole site.
Should we first do a study with a company specialist in lightning protection or can we work directly with manufacturers of lightning protection equipment?
If we make a 3D autocad drawing of the whole site and send to the manufacturers will this be ok?
Is the earth network of the whole site required?
Some french companies have told us we must do the following. I do not have exact English translation
ARF : Analyse du Risque Foudre
ETF: Étude Technique Foudre
analyse: analysis
risque: risk
foudre: lightning
etude: study
technique: technical
Is this the correct way to do it?
During construction, there were many contractors working on site. Due to various reasons, there was not a correct handing over of all documents, etc.
We do not have a wiring for the whole earthing network. Is there a special equipment that is used to determine the earthing network? Or it should be done manually by someone?
We can see earth cable coming out of the ground and connected to earth busbars at various places all round the site. And cables interconnecting all the points.
Thank you
We are a power plant. Since construction, lightning rod were installed on the boiler, substation 66 kV, lightning arresters on 66 kV lines and earth cables over 66 kV transmission lines. Over time 2 additional small power plants were constructed. They are not sufficiently protected against lightning.
We want to do a study for lightning protection of the whole site.
Should we first do a study with a company specialist in lightning protection or can we work directly with manufacturers of lightning protection equipment?
If we make a 3D autocad drawing of the whole site and send to the manufacturers will this be ok?
Is the earth network of the whole site required?
Some french companies have told us we must do the following. I do not have exact English translation
ARF : Analyse du Risque Foudre
ETF: Étude Technique Foudre
analyse: analysis
risque: risk
foudre: lightning
etude: study
technique: technical
Is this the correct way to do it?
During construction, there were many contractors working on site. Due to various reasons, there was not a correct handing over of all documents, etc.
We do not have a wiring for the whole earthing network. Is there a special equipment that is used to determine the earthing network? Or it should be done manually by someone?
We can see earth cable coming out of the ground and connected to earth busbars at various places all round the site. And cables interconnecting all the points.
Thank you