Of course, there should also associated items indicating the allowable construction tolerances (ie how much the Contractor can be out without it being "wrong") and how much the Engineer can alter the line and grade in the field without the Contractor being allowed to apply for an extra.
David
David Dietrich
KMK Consultants Ltd
Windsor, Ontario, Canada