mrengineer
Structural
- Feb 11, 2002
- 157
I designed a 4-story wood dorm with 2x6 studs and wood trusses both at 16" o.c. On the drawings I had a note that the studs and trusses should line up to avoid loading the double top plates in bending and shear. The contractor has submitted shop drawings for prefabricated wall assemblies. My question is am I being unrealistic in asking things to line up? The building is fairly typical dorm construction in that the long sides of the building are load-bearing, along with the two corridor walls. It will obviously require a great deal of coordination on the wall fabricators part to insure that studs along 4 different walls line up.