Hello,
I've to model an xlam wall. This one is divided into two walls: first plane wall (2.95 m) and second plane wall (2.95 m). These walls are connected with non linear multiplastic link (hold downs and angle brackets). There is a problem: when I draw the wall above, Sap2000 merges this one with the wall below and so I cannot insert links. How can I divide 2 walls? How can I insert links between them in such a way as to restore the congruence? I attach an image to to better explain the problem.
I've to model an xlam wall. This one is divided into two walls: first plane wall (2.95 m) and second plane wall (2.95 m). These walls are connected with non linear multiplastic link (hold downs and angle brackets). There is a problem: when I draw the wall above, Sap2000 merges this one with the wall below and so I cannot insert links. How can I divide 2 walls? How can I insert links between them in such a way as to restore the congruence? I attach an image to to better explain the problem.