pelelo
Geotechnical
- Aug 10, 2009
- 357
Hello,
I was reviewing a geotechnical report for a 40 story tower. One of the sections included settlement analysis.
The engineer, stated in one specific paragraph that for settlement analysis purposes, he considered 100% of the dead load and "a reduced live load (LL"). He did not go into more details about how much was the LL reduced and why.
Anyone one has any idea about this Live load reduction factor for settlement analysis purposes? and why?. TO my knowledge, it would make more sense to consider the full LL as we need to design for the worst case scenario.
I was reviewing a geotechnical report for a 40 story tower. One of the sections included settlement analysis.
The engineer, stated in one specific paragraph that for settlement analysis purposes, he considered 100% of the dead load and "a reduced live load (LL"). He did not go into more details about how much was the LL reduced and why.
Anyone one has any idea about this Live load reduction factor for settlement analysis purposes? and why?. TO my knowledge, it would make more sense to consider the full LL as we need to design for the worst case scenario.