Alaani
Structural
- Feb 4, 2013
- 6
Contractor missed to place reinforcement ( clearly shown on the design drawings ) to a load bearing CMU wall. Dowels were provided at the bottom with #5 @ 32" O.C.
What options available to fix this ? And what is the typical structural repair/rectification in this case ?
What options available to fix this ? And what is the typical structural repair/rectification in this case ?