ldavison10
Industrial
- Jan 17, 2008
- 14
Hi,
I have a bank of 3 vertical pipes fixed with unistrut to sheeting rails at 2 metre centres. The client has asked for the loading of these pipes which I assume is at each sheeting rail.
Whats the first step in calculating the loads, its been 10 years since i did this at college. I know the pipe weights in kg/m both empty and full and the distance from floor level. All im missing is the knowledge of the equation.
Thanks
Lee
I have a bank of 3 vertical pipes fixed with unistrut to sheeting rails at 2 metre centres. The client has asked for the loading of these pipes which I assume is at each sheeting rail.
Whats the first step in calculating the loads, its been 10 years since i did this at college. I know the pipe weights in kg/m both empty and full and the distance from floor level. All im missing is the knowledge of the equation.
Thanks
Lee