sme76
Structural
- Apr 5, 2004
- 11
I've got a project that is an addition to a recreation center. Part of the project is the addition of an elevated track for walking and jogging. I've got questions about the appropriate live load to use. My instinct says to use 100psf. ASCE 7-98 lists 60psf for walkways (other than exitways, I've used 80psf for 2nd story corridors, and I've designed pedestrian bridges for 85psf (AASHTO). Has anybody done an elevated track before? What live load used. This project falls under IBC 2000.