Hello Everyone, I have a 6 storey apartment that has a transfer Slab on the first floor.
The Transfer Slab is post tension concrete slab. So to work out the point load/line load that need to be transfer on this level, what do you guys normally do? I build the whole model including the transfer slab in Etabs and then read the pier/frame axial force to get the loading that apply on the transfer slab.
However, Some people would use traditional way to work out the loading, i.e. Calculate the structure above the transfer slab separately (either by hand calculation or establish to model of the structure above the transfer floor (second floor to roof) using 3D RC software like Etabs) and then get the reaction of each column and wall and apply to the Transfer Slab. These two different way will lead to two very different results. I tend to build the whole structure as calculating the structure above separately will ignore the stiffness of the structure below. The supports that we assume in method two are actually elastic springs. And the loading distribution will be affected by the structure layout (stiffness condition below).
So what do you guys normally do? Do I need to envelope these two different method (considering the results differ greatly)?
Thank you.
The Transfer Slab is post tension concrete slab. So to work out the point load/line load that need to be transfer on this level, what do you guys normally do? I build the whole model including the transfer slab in Etabs and then read the pier/frame axial force to get the loading that apply on the transfer slab.
However, Some people would use traditional way to work out the loading, i.e. Calculate the structure above the transfer slab separately (either by hand calculation or establish to model of the structure above the transfer floor (second floor to roof) using 3D RC software like Etabs) and then get the reaction of each column and wall and apply to the Transfer Slab. These two different way will lead to two very different results. I tend to build the whole structure as calculating the structure above separately will ignore the stiffness of the structure below. The supports that we assume in method two are actually elastic springs. And the loading distribution will be affected by the structure layout (stiffness condition below).
So what do you guys normally do? Do I need to envelope these two different method (considering the results differ greatly)?
Thank you.