I've been struggling with the application of Loading Units on hot and cold water supplies and BS EN 806. In theory this is a simple method of adding up the units to conclude what supply is required. But what I don't know is whether the loading units allow for both hot and cold water i.e. do you add a hot tap and a cold tap or does the loading unit allow for both?
Or, do we combine all of the hot and cold at the point where the water is generated?