jmedclay
Mechanical
- Apr 6, 2010
- 6
What is typical for sending HOA switch position status to a PLC for garden variety process control?
One signal & one PLC input for explicit status of each of the three positions, or two (Hand/Run and Auto) with Off being implied by the state of the other two? I'm thinking false status via wire breaks or switch problems.
Thanks much,
John