I have recently run into a problem on a project where an MUA CSO line (36" CIP) with a 20' easement is in conflict with my site layout.
The MUA is asking for 3'+/- precision in locating this pipe to establish the correct easement (no plans or records with correct information are available).
The line is approx 50' deep, is cast iron, and is buried under a cruddy fill (large boulders and cobbles throughout). The site is extremely tight (on the top of a cliff) and layout is extremely limited. We have access to upstream and downstream manholes, the upstream manhole is 45'deep, the downstream 15 (sitting at base of cliff).
Does anyone know of any technology that might allow me to locate this line?
Thanks.
The MUA is asking for 3'+/- precision in locating this pipe to establish the correct easement (no plans or records with correct information are available).
The line is approx 50' deep, is cast iron, and is buried under a cruddy fill (large boulders and cobbles throughout). The site is extremely tight (on the top of a cliff) and layout is extremely limited. We have access to upstream and downstream manholes, the upstream manhole is 45'deep, the downstream 15 (sitting at base of cliff).
Does anyone know of any technology that might allow me to locate this line?
Thanks.