homeytc
Industrial
- Nov 17, 2006
- 3
I presently work in a facility that has automated cranes. The cranes are powered through a 4 wire 480 VAC overhead power rail that is 80 feet about the power distribution enclosure. My question is; is a local disconnect required at the maintenance platform where repairs are preformed for the power rail and the brush assemblies for the crane?