jeepy96
Mechanical
- Jun 8, 2010
- 2
Hey guys,
I have a question concerning the low water cutoff switch maintenance practices suggested in these two sections. We run 2 fire tubes boilers and one water tubes boilers.
Section VI - Care for Heating Boilers:
- Suggested that a slow drain test should be performed. (slow drain = draining the boiler level down to the low water cutoff switch set point (2’’ over tubes))
Section VII - Care for Power Boilers:
- Slow drain test aren’t suggested.
Q: Why are slow drain tests suggested for Heating Boilers and not Power Boilers?
Is there any risk associated to a slow drain test with Power Boilers?
Thank you
Have a nice day
I have a question concerning the low water cutoff switch maintenance practices suggested in these two sections. We run 2 fire tubes boilers and one water tubes boilers.
Section VI - Care for Heating Boilers:
- Suggested that a slow drain test should be performed. (slow drain = draining the boiler level down to the low water cutoff switch set point (2’’ over tubes))
Section VII - Care for Power Boilers:
- Slow drain test aren’t suggested.
Q: Why are slow drain tests suggested for Heating Boilers and not Power Boilers?
Is there any risk associated to a slow drain test with Power Boilers?
Thank you
Have a nice day