Muhammad A
Electrical
- Feb 17, 2024
- 7
Hi All.I want to lay multicore PVC aluminium cable in a trench 300mm wide and 450mm deep( bricks used)This trench will have supports to support cable and this trench will have cover at top only means 300mm x 450mm area will be hollow throughout and only covers( may be concrete slabs) at top .What derating factors will be applied for ths .load is 220Amps and 400V three phase.