Pete S
Civil/Environmental
- Jan 29, 2024
- 2
A contractor was required to install a flush triple 1-3/4 x 9-1/4 LVL with a double 3/8" flitch plate. The member was manufactured as prescribed, however upon installation the contractor elected to sister an additional 1-3/4 x 9-1/4 LVL to the member. The sistered LVL was not thru bolted to the existing member but rather face nailed 3 rows at 12" o.c.. Without requiring the contractor to drill and thru bolt the entire modified beam, I'm having trouble assessing whether the face loads on the sistered beam are properly being transferred to the engineered member. This may be trivial and I may simply be overthinking, but I'm not necessarily sure how to approach this case. The connection can simply be fortified with lags but will the offset centroid cause any adverse performance within the beam? First post. Thank you in advance!