PennStateIE
Industrial
Anyone here ever have to deal with a feuding maintenance group vs. operations group? Each side blames each other for downtime and I'm stuck in the middle trying to reduce the downtime.
Also on a side note, what do people typically consider "allowable" downtime for product changeover, daily PM, etc? I think we allow too much downtime (1 hr) per shift.
Also on a side note, what do people typically consider "allowable" downtime for product changeover, daily PM, etc? I think we allow too much downtime (1 hr) per shift.