Has anybody had experience designing on-site septic for mining/oil man-camps with about 200 people in the Dakotas. One issue is there is no receiving stream, as the area drains to a local depression/wetland. I'm trying figure out what is typically done in this area. Obviously, a leach field or mound system would be to large because of the GPD loading.
Thanks!