Hi,
I'm dealing with three phase separators project.where pipings have been changed to B1 class from existing B2 class.
The change in piping class does have any complications or not.
Please advise me, shall I allow or cancel this change.
Thanks
10815l
I'm dealing with three phase separators project.where pipings have been changed to B1 class from existing B2 class.
The change in piping class does have any complications or not.
Please advise me, shall I allow or cancel this change.
Thanks
10815l