metalchair
Structural
- Oct 25, 2022
- 13
Good Morning All,
Just a quick question regarding how to consider loads from some permanent equipment in a manufacturing facility.
I am designing a 2nd floor mezzanine that is to be used to support heavy manufacturing equipment at a load of 250psf per ASCE 7 table 4.3-1. This is fairly straight-forward when considering gravity loads only. However, when calculating seismic loads and seismic weight, do I also include the weight of the permanent equipment (conveyors, etc.)? Or is that overly conservative, as the equipment is wrapped up into the 250psf live load?
I figure using the 250psf live load and also including the true weight of the equipment in the seismic weight calculation is going to cover all my bases, however, I am wondering if this is overly conservative.
Any help is greatly appreciated.
Just a quick question regarding how to consider loads from some permanent equipment in a manufacturing facility.
I am designing a 2nd floor mezzanine that is to be used to support heavy manufacturing equipment at a load of 250psf per ASCE 7 table 4.3-1. This is fairly straight-forward when considering gravity loads only. However, when calculating seismic loads and seismic weight, do I also include the weight of the permanent equipment (conveyors, etc.)? Or is that overly conservative, as the equipment is wrapped up into the 250psf live load?
I figure using the 250psf live load and also including the true weight of the equipment in the seismic weight calculation is going to cover all my bases, however, I am wondering if this is overly conservative.
Any help is greatly appreciated.