- Jun 17, 2015
- 45
Hello all,
I am but a lowly EIT that started two weeks ago and I'm looking at a Masonry wall that has already been built - 8" CMU, grouted 32" on center with (1) #6, etc etc. It's for a retail store. Well, the building has almost opened but now the owner needs a screen wall to cover the HVAC equipment on the roof, and to do so the architect has proposed a screen wall system that fastens to the exterior wall. In doing so, however, would effectively add a 7' parapet where previously there was none, so there's a bunch of stuff now that's in the red (the wall, deck shear, etc etc.)
Specifically though, for the sense of brevity, I've calculated that the wall reinforcement needs twice as much (#6 grouted @ 32" O.C., offset from the existing vertical reinforcement, so it will now me #6 @ 16" O.C.) Therefore I'm looking into the cost of doing this and I'm not sure where to start. I have an RS Means in front of me but could someone enlighten me the process of adding more grouted cells with reinforcement goes and how that works, so I have somewhere to start estimating?
Thanks a bunch everyone!
I am but a lowly EIT that started two weeks ago and I'm looking at a Masonry wall that has already been built - 8" CMU, grouted 32" on center with (1) #6, etc etc. It's for a retail store. Well, the building has almost opened but now the owner needs a screen wall to cover the HVAC equipment on the roof, and to do so the architect has proposed a screen wall system that fastens to the exterior wall. In doing so, however, would effectively add a 7' parapet where previously there was none, so there's a bunch of stuff now that's in the red (the wall, deck shear, etc etc.)
Specifically though, for the sense of brevity, I've calculated that the wall reinforcement needs twice as much (#6 grouted @ 32" O.C., offset from the existing vertical reinforcement, so it will now me #6 @ 16" O.C.) Therefore I'm looking into the cost of doing this and I'm not sure where to start. I have an RS Means in front of me but could someone enlighten me the process of adding more grouted cells with reinforcement goes and how that works, so I have somewhere to start estimating?
Thanks a bunch everyone!