hello12345hello
Structural
- Apr 25, 2011
- 50
I have masonry wall and have vertical rebar at every 32" o.c. so i will grout those cells only where i have vertical rebar. but if i will add horizontal rebar at every 48" o.c. due to shear wall then do i have to use solid grouted wall or i should just add bond beam at 48" o.c. with rebar. so that i do not have make solid grouted wall?