ChiEngr
Structural
- Oct 19, 2021
- 77
Anybody have recommendations for the base of a CMU wall partition to a slab on steel floor deck connection? I have 2” composite deck + 3 1/4” LW concrete. I am thinking of embedding the vert bars 2.5” into the slab below with HY200 adhesive but not sure if there is a better option.