Has anyone used temperature monitoring and cooling methods when pouring major equipment foundations at power plants? I am currently specifying that my 6 to 8 foot thick foundations and tabletops conform to the temperature control/monitoring requirements of ACI 207. I have been told that this "is never done for power plants". Since PCA says >3' is mass concrete and ACI 351 says to account for the requirements of ACI 207 for major equipment foundations, i am confused as to how this has never been done. Any help will be much appreciated.