This is a question Ive always had in my mind with Reinforced concrete design. Sometimes the maximum frame moment accurs at a construction joint simply because of construction technique e.g. footing to retaining wall joint, column to slab joint, or beam to column joint.
Is the joint especially designed taking in account the weakness inherent in the joint? or designed as if it cast monothically. Incidently how about the design of connections in RC concrete.
I'd love to hear any comments/ thoughts amongst designing engineers.
Thanks !