jaengineering
Civil/Environmental
- Oct 22, 2007
- 5
I have a challenging site fitting a new building & parking between two existing buildings. The best grade I can get on my parking lot grades is 6.5% to 6.9%. I normally use 5.0% as maximum grade in parking lots.
Anyone constructed ~6.9% slopes. How do they work now?
Thank you in advance for your help.
Best Regards
as
Anyone constructed ~6.9% slopes. How do they work now?
Thank you in advance for your help.
Best Regards
as